How do I find commercial construction projects before they go out to bid?

Read the public planning and zoning record. Nearly every commercial project files a rezoning, site plan, plat or use permit months before any building permit, and the filing names the applicant, the property owner, and the attorney or engineer of record. Whoever reads those agendas first meets the people behind the project first.

Where does a project first appear in public?

Long before a bid invitation, a commercial project has to get permission to exist. That permission runs through a city or county planning commission, zoning board or council, and every step of it is published.

  1. MONTH 0First public filing. The applicant files for a rezoning, a site plan, a preliminary plat or a special use permit. The application, the site drawings and the staff report land in a public meeting packet.
  2. WEEKS INPublic hearing. The planning commission or council hears the case. The applicant, the owner's representative and usually the engineer are in the room. Staff recommends approval, denial or deferral.
  3. MONTHS INPermits. Design is underway and building permits get pulled. This is where permit-monitoring services first see the project. The design team, and often the general contractor, is already chosen.
  4. 6 TO 24 MONTHS INOut to bid. Drawings are issued and the project shows up on the bid boards and in the plan rooms. Everyone finds out at once. The short list already exists.

Bid databases start at step four. Permit feeds start at step three. The relationships that decide negotiated work are formed at steps one and two.

What does the filing tell you?

More than a permit record ever will, because an entitlement application has to argue its case in public. A typical hearing packet gives you:

For a BD person, that is a call list and a timeline on one page.

How many of these are on file right now in Metro Atlanta and Nashville?

These counts come from the same nightly read that powers the FirstDirt feed: commercial-side projects on file across the planning and zoning bodies we currently cover.

METRO ATLANTA
—
projects on file, across the jurisdictions we read
METRO NASHVILLE
—
projects on file, across the jurisdictions we read

Counts refresh nightly from the public record.

Each one is a project that has not reached a permit yet, and most have not reached a bid board. You can browse the current set on the homepage by metro and trade.

Why is the bid board late?

Because a bid invitation is the last public event in a project's life, not the first. By the time drawings are issued, the owner has worked with an architect for months, the civil engineer has been through at least one hearing, and on negotiated work the general contractor was picked before design started. A subcontractor who first hears about the job from a plan room is competing against firms that were in the room a year earlier.

The same list also goes to everyone in your trade at the same moment. A public filing read early is the opposite: the people are named, the timeline is months long, and almost nobody else is looking.

How do I read these filings myself?

You can. Every jurisdiction publishes its agendas on a meeting portal, and most metros run on a handful of platforms: CivicClerk, Legistar, PrimeGov, IQM2, Granicus, CivicPlus Agenda Center, Municode and eScribe among them. The work is in the volume and the reading.

A BD person can cover one or two jurisdictions this way and keep their day job. FirstDirt covers all of them every night, pulls the applicant, owner, representative and engineer out of each packet, groups the filings into projects, and puts the result in a feed with the public source document one click away. The source is public; the reading is the work.

Frequently asked questions

How far ahead of a permit does a commercial project show up in planning filings?
Months, and on larger projects often more than a year. The rezoning, site plan or plat is filed first, the public hearing follows a few weeks later, design and permits come after approval, and the project goes out to bid 6 to 24 months after that first filing.
Is this information public?
Yes. Planning and zoning agendas, hearing packets and staff reports are public records that each city or county publishes on its own meeting portal. FirstDirt reads what the jurisdiction publishes and nothing else.
Which filings matter most to a contractor?
Rezonings, site plans, preliminary plats, and special or conditional use permits tied to new construction. Variances are worth a look when they accompany a new building. Text amendments, sign variances and single-lot residential items are noise for commercial BD.
Does FirstDirt cover my market?
Metro Atlanta and Metro Nashville today. The coverage map at firstdirt.ai/coverage lists every planning and zoning body read each night, and a jurisdiction inside the radius that is not live yet can be requested from the same page.

See what is on file in your metro.

Real projects from this week's planning dockets, with the people the filings name. 14 days free, no card.

Start a free trial